photo EnviroLibraryBanner98x.png
Normal view MARC view ISBD view

Preliminary environmental impact assessment for the installation of the 126.5 km. 18 inch gas trunkline from Baronia to E11 : Baram delta Gas Gathering Project

By: PERUNDING Techsain.
Contributor(s): Petronas Carigali.
Material type: materialTypeLabelBookPublisher: [s.l.] Petronas Carigali Description: v,107p. : ill.; 31cm.Subject(s): Environmental impact assessment | Gas Industry -- Sarawak | Gas Pipilines -- Sarawak | Sarawak -- gas industry
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due
Books Books Library Putrajaya
EIA REPORT
Q MR 665.773 PER (Browse shelf) Available

There are no comments for this item.

Log in to your account to post a comment.
Copyright © 2015. Department of Environment Malaysia (DOE) Library. All rights reserved.This site is best viewed using Internet Explorer 11+, Mozilla Firefox, Google Chrome and Safari with resolution 1280x768 pixels and above